Selected References
Frankfurt International Airport
Germany (2019-2020)
Construction New Apron Code F
Airfield Ground Lighting, Apron Floodlighting
- Detailed Design
- Tendering
- Installation Supervision
- Site Acceptance Testing
Bremen International Airport
Germany (2019-2020)
Apron Floodlighting / 400Hz Ground Power
High Masts with LED Lighting, Static 400Hz Ground Power Units, Low Voltage Switchgear, Fibre Optical Network
- Site Survey
- Preliminary Design
- Detailed Design
- Tendering
- Installation Supervision
- Site Acceptance Testing
Hannover International Airport
Germany (2018)
Refurbishment RWY09R/TWY B,D
Airfield Ground Lighting
- Site Survey
- Preliminary Design
- Detailed Design
- Tendering
- Installation Supervision
- Site Acceptance Testing
Frankfurt International Airport
Germany (2018)
Refurbishment of Taxiway M21
Airfield Ground Lighting
- Site Survey
- Preliminary Design
- Detailed Design
- Tendering
- Installation Supervision
- Site Acceptance Testing
Frankfurt-Hahn International Airport
Germany (2016-2017)
Relocation of Threshold 03
Airfield Ground Lighting, Glide Path, Meteo
Fibre Optical Network
- Site Survey
- Detailed Design
- Tender Preparation
- Installation Supervision
- Site Acceptance Testing
Berlin-Schoenefeld International Airport
Germany (2015)
Refurbishment of Runway 07L/25R
Airfield Ground Lighting
- Detailed Design Examination
- Installation Supervision
- Site Acceptance Testing
Mazar e-Sharif International Airport
Afghanistan (2012-2014)
MLAT Approach System
New Control Tower
- Detailed Design
- Tendering
- Project Supervision
- Site Acceptance Testing
- Documentation
Frankfurt-Hahn International Airport
Germany (2013-2014)
Relocation of ILS 03
Infrastructure Power and Communication Network
- Site Survey
- Detailed Design
- Tender Preparation
- Installation Supervision
- Site Acceptance Testing
Bremen International Airport
Germany (2013-2014)
Installation of Runway Guard Lights
- Site Survey
- Detailed Design
- Tender Preparation
- Installation Supervision
- Site Acceptance Testing
Stuttgart International Airport
Germany (2012-2013)
Airfield Lighting Control and Monitoring System
- Site Survey
- Detailed Design
- Tendering
- Project Supervision
- Site Acceptance Testing
- Documentation
Bremen International Airport
Germany (2011-2013)
Refurbishment of Runway 09/27
- Site Survey
- Detailed Design
- Tender Preparation
- Installation Supervision
- Site Acceptance Testing